By the numbers

We build the foundation, teams build the product

The proof is in what teams do with it: source pulled every day, engineering time saved, and finished screens shipped across every surface.

236k
Installs a month
Component source pulled straight from the registry by teams shipping in production.
$4.2M
Teams have saved over four million dollars in engineering time.
Recaptured in the first year alone, no longer spent rebuilding the same primitives from scratch.
214,000
Screens shipped this year
Accessible, polished interfaces assembled across every product surface.